Home > Project, Transportation > Autoroute 30

Autoroute 30

December 2nd, 2009 Leave a comment Go to comments

autoroute 30_sm$1.5 billion

Sector: Transportation

Location: Montreal, Quebec

Key Players: Nouvelle Autoroute 30 CJV S.E.N.C. (design-build joint venture) Dragados Canada Inc., Acciona Infrastructures Canada Inc., Construction DJL Inc.; MMM Group (engineer); Arup Canada (design); Verrault Inc. (Strategic Partner)

Owner: Ministère des Transports (MTQ)

Financing: P3 – Nouvelle Autoroute 30 CJV S.E.N.C. has a design-build-finance-maintain-operate (DBFMO) contract with the MTQ for a 35-year term.

Status: Scheduled for completion in 2012.

Project Details: The section of highway between Chateauguay and Vaudreuil-Dorion will be a P3, while the Eastern section to the south of Candiac, Delson, and Saint-Constant will be completed by the MTQ using the conventional method. The province may still assign the maintenance and operation of this section to a private partner.



Categories: Project, Transportation Tags:
  1. No comments yet.
  1. No trackbacks yet.
You must be logged in to post a comment.