Calgary International Airport Development
$1.3 billion
2009 Ranking: 11 (International Facilities Project)
Sector: Port/Airport
Location: Calgary, Alberta
Key Players: AECOM (project management consultant, electrical and mechanical consultant); Cohos Evamy Integrated Design (prime design consultant); EllisDon (construction manager)
Owner: Calgary
Airport Authority
Financing: Public – Financed by the Calgary Airport Authority.
Status: Scheduled for completion in 2015.
Project Details: The overall program includes a number of projects, including a temporary baggage hall expansion, terminal renovations and the new terminal expansion for the E Pier. There will be an addition to the existing terminal and extensive renovations to address projected passenger levels for both transborder and international travel.
Project Details: The Point Lepreau Nuclear Generating Station is the only nuclear power facility in the Atlantic provinces—at full operation, the 25-year-old facility produces 30 per cent of the power the province uses. Refurbishment, which includes replacing 380 fuel channels, calandria tubes and feeder pipes, was supposed to be complete in 2009, but as of January 2009 it was about four months behind.