Eastmain-1-A/ Sarcelle/Rupert Project
2012 Rank: 5
2011 Rank: 3
Sector: Hydroelectric
Location: James Bay Territory, Quebec
Owner: Hydro-Québec
Engineer: AECOM (detailed engineering—Rupert River Diversion and La Sarcelle Power Plant, engineering and mechanical consultant); SNC-Lavalin (complete engineering—Rupert diversion and Eastmain-1-A power plant, construction support)
Project/Construction Manager: Société d’énergie de la Baie James (project manager)
Other: AECOM (environmental consultant)
Supplier: Alstom (turbines: Eastmain 1); Voith Siemens (turbines: Eastmain 1A); Alstom (turbines: Sarcelle)
Funding: Public
Status: Under construction with expected completion in 2012.
Description:
Components of the superstructure will be prefabricated at the job site and transported to the powerhouse site for assembly. Also, part of construction is a new drinking water plant in Waskaganish, which will meet the community’s needs until 2025. Transmission is also being developed: Two 315-kilovolt (kV) lines will be built between Eastmain-1 and Eastmain-1-A, and between Sarcelle and Eastmain-1.