Edmonton Valley Line – Stage 1

Back to 2013 Project List


Image Credit: City of Edmonton

Ranking for 2013: 9

Industry Sector: Transit

Specific Sector: LRT

Range: $1 billion - $5 billion

Project Value: $1,800,000,000

Federal: $400 million

Provincial: $600 million

Government Funds Involved: Municipal: 
$800 million

Funding Source: P3

Location: Edmonton, Alberta

Estimated End Date of Substantial Completion: 2020

LEED: N/A


The Valley Line is the largest single infrastructure project in the history of Edmonton. It consists of a 27-kilometre, low-floor urban line running from Mill Woods to Lewis Farms that crosses downtown. It will be separate from the city’s existing high-floor LRT system. This line will feature modern, low-floor, light-rail vehicles running segregated along existing streets and integrating with Edmonton’s surrounding neighbourhoods. The 13.1-kilometre southeast section from Mill Woods to 102 Street (Stage 1) will be the first section to be built, with future extensions eventually taking the line out west Lewis Farms. The southeast section of the line will be constructed first.


© 2017 Top100 Projects. All rights reserved. Site Admin · Entries RSS · Comments RSS
Powered by WordPress · Designed by Theme Junkie