The Milner Energy Centre

Back to 2016 Project List


Ranking for 2016: 50

Industry Sector: Energy

Specific Sector: Natural Gas

Range: $1 billion - $5 billion

Project Value: $1,000,000,000

Government Funds Involved: N/A

Funding Source: Private

Location: Grand Cache, Alberta

Estimated End Date of Substantial Completion: 2020

LEED: N/A


In June 2014, the Alberta Utilities Commission (AUC) approved MAXIM’s application to construct and operate a 520-MW natural gas-fired expansion (M2) at the site of the existing 150-MW Milner generating facility (M1). The M2 expansion will be located adjacent to M1 and will take advantage of the existing infrastructure at the site, allowing MAXIM to leverage electrical connection, fuel delivery, water licenses, and a skilled operations team. Natural gas will be supplied via an expansion of the existing natural gas pipeline that currently supplies M1. In February 2015, the AUC approved MAXIM’s application for an 86-MW expansion (M3) to M1; the expansion will be composed of two natural gas-fired turbines located next to M1. Exhaust energy from these turbines will be converted to steam and utilized to generate electricity in the existing M1 steam turbine, displacing coal-sourced steam. These two initiatives will increase the capacity at the Milner site from 150 MW to 756 MW. Construction timing for both projects is pending clarity on new climate change initiatives and regulations. It is also anticipated that M3 would be completed in advance of M2.


Owner(s)

© 2017 Top100 Projects. All rights reserved. Site Admin · Entries RSS · Comments RSS
Powered by WordPress · Designed by Theme Junkie