The Sheppard East LRT is a 13-kilometre LRT line that will

run from Don Mills station to Morningside Avenue. The

project includes a 1.1-kilometre tunnel from the subway

station to Consumers Road, along with 11.9 km of above surface track, running in a dedicated lane down the centre of Sheppard Avenue. The line will include up to 26 surface stops. The start of construction was scheduled for sometime in 2017, but delays have caused the construction start to be pushed to 2021.