Surrey Langley SkyTrain Project

Rank 2024

20

Image Credit: BC Ministry of Transportation and Infrastructure

Industry Sector: Transit

Project Type: LRT

Project Value: $4.01 billion

Funding Source: Public

Province: British Columbia

City / Region: Surrey

Estimated End Date of Substantial Completion: 2028

The Surrey Langley SkyTrain Project is a 16-kilometre extension of the Expo Line primarily along Fraser Highway from King George Station in Surrey to 203 St. in Langley City Centre. With an elevated guideway, eight new stations, and three new transit exchanges, travel time between Langley City Centre and Surrey City Centre will be 22 minutes. Advance works continue including the relocation of utilities (including transmission, distribution, and telecommunications lines), and the property acquisition process. The Surrey Langley SkyTrain Project will be delivered through three separate contracts – one for the guideway, another for the stations, and a third for the design and installation of SkyTrain systems and trackwork. Contract awards are expected in 2024 along with the start of early works and major construction. 

Project Owner: Province of British Columbia (The Transportation Investment Corporation is leading the delivery of the project on behalf of the Ministry of Transportation and Infrastructure

Engineer: Hatch (lead engineer); Westco, DIALOG; AECOM (design); COWI (owner’s)

Contractor: TBD

Other Key Players: Deloitte; Golder-a WSP company (geotechnical studies); McElhanney Consulting Services; Ausenco; Charter PDI; Hanscomb (cost consultant); Morrison Hershfield (early works); Parsons; Colliers Project Leaders; EY (advisory services); GeoVerra (early works)

Legal: Norton Rose Fulbright; Borden Ladner Gervais

2023 Rank: 20

2022 Rank: 21

2021 Rank: 39

2020 Rank: 38

2019 Rank: 32