Highway and bridge construction delays traffic near High River

Motorists can expect minor delays on Highway 540 near High River to accommodate paving.

Paving begins Aug. 9 from the junction with Highway 22 to the junction with Highway 2. Traffic may be reduced to alternating single lane controlled by flag people. The speed limit will be reduced to 50 km/h through the construction zone.

Share This Post

Recent Articles

© 2019 Top100 Projects. All rights reserved. Site Admin · Entries RSS · Comments RSS
Powered by WordPress · Designed by Theme Junkie