Bowmanville Extension Project

Rank 2022

77

Image Credit: Metrolinx

Industry Sector: Transit

Project Type: Rail

Project Value: $655 million

Funding Source: Public

Provincial Funding: $655 million

Province: Ontario

City / Region: Bowmanville

Estimated End Date of Substantial Completion: 2024

Building on the recommendations of the Bowmanville Expansion Initial Business Case (IBC) approved at the February 2020 Metrolinx Board meeting, the Preliminary Design Business Case confirms the feasibility of the alignment identified in the IBC, while examining two different weekend service options. The alignment proposes one new track plus sidings and passing tracks where necessary through Oshawa GO station connecting to CP’s GM spur line to cross Highway 401, making an eventual connection through CP’s Belleville Subdivision to Bowmanville. When service opens in 2024, the line will provide four morning trips along the line to Union Station in downtown Toronto, and four afternoon trips making all station stops to the new Bowmanville station. In September 2021, geotechnical work began along the Canadian Pacific-owned part of the rail corridor that eventually will lead to an expanded GO Transit line all the way to Bowmanville.

Project Owner: Metrolinx

Engineer: Wood Group (design)

Other Key Players: Wood, Stantec (technical advisory services); Deloitte, Golder (a member of WSP), AECOM

2022 Rank: 77

2021 Rank: 80

2020 Rank: 81

2019 Rank: 82

2018 Rank: 82