Bruce Power Refurbishment

Rank 2024

3

Image Credit: Bruce Power

Industry Sector: Energy

Project Type: Nuclear

Project Value: $13 billion

Funding Source: Private

Private Funding: $13 billion

Province: Ontario

City / Region: Tiverton

Estimated End Date of Substantial Completion: 2033

In 2015, Bruce Power reached an agreement with the Independent Electricity System Operator (IESO) to advance a long-term investment program to extend the life of its nuclear feet and secure the site’s operation until 2064. The Life-Extension Program started on January 1, 2016, and began with the replacement of older systems during regularly scheduled maintenance outages. As part of the Life-Extension Program, Bruce Power is carrying out an intensive Major Component Replacement (MCR) Project, which began in January 2020 and focuses on the replacement of key reactor components in Units 3-8, including steam generators, pressure tubes, calandria tubes, and feeder tubes. The first of 6 MCR refurbishments was completed on September 8, 2023 when Unit 6 was synced back to the grid. The Unit 6 MCR project was finished ahead of schedule and under budget with over 12 million hours of construction work executed over the 3.5 year project. The second MCR refurbishment began on March 1, 2023 and Unit 4 will start in 2025 with all 6 refurbishments scheduled for completion by 2033.The life extension of each unit will add approximately 30 to 35 years of operational life, while other investments will add a combined 30 reactor years of operational life to the units. 

Project Owner: Bruce Power

Engineer: Hatch (preliminary/planning study); Wood E&I (WSP) (consulting engineer); Tetra Tech (MCR); Candu Energy (MCR)

Contractor: AECOM, Aecon, AREVA NP; Framatome (steam generator replacement); Black & McDonald (Unit 6 mechanical and electrical projects); Shoreline JV: Aecon, AECOM, AtkinsRéalis (Fuel Channel Feeder Replacement program); E.S. Fox, BWXT (Highland Nuclear)

P3 Team Members/Project Team: DBFM Team (Office Complex and Training Facility): Concert Infrastructure—Bird Construction, Stantec, Concert Realty Services—Stonebridge Financial Corp.

Other Key Players: WSP (drafting support); Golder-a WSP company (geotechnical services/environmental engineering); Deloitte; AGAT Labs (analytical testing); Burns & McDonnell (integrated project controls support); Sargent & Lundy (integrated project management & project controls support); Deloitte; CIMA+; Comtech; A.W. Hooker (cost consultant); Turner & Townsend (management consultant)

Supplier Other: BWXT Canada Inc. (steam generators, feeder fabrication, end fittings, liners, and flow elements); Nu-Tech Precision Metals (zirconium alloy pressure tubes); Cameco Fuel Manufacturing (calandria tubes and annulus spacers); Brotech Precision (shield plugs); BC Instruments (Positioning assemblies, feeder hubs), Framatome (PHT chemical decontamination skid); Laker Energy Products (end fittings, liners, and flow elements); Victaulic

Legal: Osler (lead counsel); Torys (acting for the lender)

2023 Rank: 3

2022 Rank: 3

2021 Rank: 2

2020 Rank: 2

2019 Rank: 1

2018 Rank: 1

2017 Rank: 1