Hurontario LRT

Rank 2022

13

Image Credit: Metrolinx

Industry Sector: Transit

Project Type: LRT

Project Value: $5.632 billion

Funding Source: Public

Provincial Funding: $5.632 billion

Province: Ontario

City / Region: Mississauga and Brampton

Estimated End Date of Substantial Completion: 2024

The Hurontario Light Rail Transit (LRT) project will bring 18 kilometres of fast, reliable, rapid transit to the cities of Mississauga and Brampton along the Hurontario corridor. New, modern light rail vehicles will travel in a dedicated right-of-way and serve 19 stops with connections to GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga Transitway BRT. Funded through a $1.4 billion commitment from the Province of Ontario, the Hurontario LRT is a signature project of the Moving Ontario Forward plan.

Early works on the Hurontario LRT project continue, with utility relocations including new watermains, as well as road widening and bus platform relocations—all tasks to prepare for rail and station construction. Plus, excavation for the push box at Port Credit is underway. In addition, the operations, maintenance and storage facility under construction is making progress; and prep work for the installation of track is underway beside the facility.

Project Owner: Metrolinx

Engineer: SNC-Lavalin (project lead); Steer Davies Gleave (preliminary engineering); Stantec (design)

Project/Construction Manager: Infrastructure Ontario (Project Agent)

P3 Team Members/Project Team: DBFOM Team: Mobilinx Hurontario General Partnership • Applicant Lead: John Laing, Astaldi, Hitachi, Transdev, Amico Concessions, Salini Impregilo • Construction: Astaldi, Hitachi, Amico, Bot, Salini Impregilo • Design: IBI Group, Hitachi, Morrison Hershfield, Arcadis, Daoust Lestage, EXP • Operation Maintenance & Rehabilitation Provider: Transdev, Hitachi, Astaldi, Salini Impregilo • Financial Advisor: National Bank, HSBC

Other Key Players: DIALOG (urban design); Dufferin Construction; Golder- a member of WSP (preliminary geotechnical services); Hanscomb (preliminary design engineer’s cost consultant); Hatch; LEA Group (ITS); Aon (owner advisor and construction insurance broker); AECOM (owner’s representative/technical advisor); EY (financial and transaction advisory); Morrison Hershfield (transit O&M advisors); AGAT Labs; Comtech (program/project consulting); DECAST; RLB; Jacobs (program mgmt.); INTECH Risk Management; Arcadis (environmental services); Deloitte (financial advisor); Englobe; WSP (QA); HKA; INFRATA (managing consultant)

Supplier Other: DECAST (precast infrastructure)

Legal: Borden Ladner Gervais (legal advisor); Torys (acted for lender); McMillan LLP (for the proponent)

Transmission Line Length (km): 23

2022 Rank: 13

2021 Rank: 13

2020 Rank: 16

2019 Rank: 41

2018 Rank: 36

2017 Rank: 33

2016 Rank: 29

2015 Rank: 30

2014 Rank: 25