Mills Memorial Hospital Replacement Project

Rank 2023

84

Image Credit: Northern Health Authority

Industry Sector: Buildings

Project Type: Health Care

Project Value: $632.6 million

Funding Source: Public

Provincial Funding: $632.6 million ($512.4 million-Province of BC; $120.1 million-North West Regional Health District)

Province: British Columbia

City / Region: Terrace

Estimated End Date of Substantial Completion: 2026

The new Mills Memorial Hospital will be more than double the size of the existing facility. The new, state-of-the-art facility is being designed to address the current and future needs of patients in Northwest BC. The acute care hospital and integrated services facility will be a centre for trauma services, orthopedic surgeries, pathology, radiology, clinical support, and pharmacy services. The hospital will also be a training site for medical students in the Northern Medical Program. The Mills Memorial Hospital Replacement project also includes the construction of a new Seven Sisters mental health facility. The new Seven Sisters will be nearly double the size of the current facility. In addition to an increase in beds, from 20 to 25, the new Seven Sisters will include more amenities. Both new facilities are being built on the same 17-acre property on which the current ones are located.

Project Owner: Northern Health Authority

P3 Team Members/Project Team: Design-Build: PCL Westcoast Constructors Inc.

Other Key Players: WSP (owner’s engineering representative); McElhanney (quality control)

Architect Names: HDR Architects (subcontracted by PCL)

2022 Rank: 81

2021 Rank: 93

2020 Rank: 95

KEY PLAYERS

Platinum Elite (20+ Projects)
Platinum (10-19 Projects)
Gold (6-9 Projects)
Silver (3-5 Projects)
Bronze (1-2 Projects)