The SRB Pie-IX project consists in setting up permanent high-level dedicated lanes, allowing buses to run on Pie-IX Boulevard, between Saint-Martin Boulevard in Laval and Pie metro station-IX, in Montreal. The 11-kilometre route will have 17 stations, with two in Laval and 15 in Montreal, and a 750-spot parking space at Laval’s terminal station. 2022 will see the delivery of most of the project—from Saint-Martin Boulevard in Laval to Pierre-De Coubertin Avenue in Montreal (except for the Jean-Talon section between Everett and Bélair). The delivery of the Jean-Talon section, including construction of a pedestrian tunnel between the Pie-IX BRT and the future Blue Line extension station, is planned for 2023. The construction is currently started in 2021 and will continue in 2022. Detailed engineering concerning a final 1.6-kilometre section from Pierre-De Coubertin Avenue to Notre-Dame Street East will be completed.