Building on the recommendations of the Bowmanville Expansion Initial Business Case (IBC) approved at the February 2020 Metrolinx Board meeting, the Preliminary Design Business Case confirms the feasibility of the alignment identified in the IBC, while examining two different weekend service options. The alignment proposes one new track plus sidings and passing tracks where necessary through Oshawa GO station connecting to CP’s GM spur line to cross Highway 401, making an eventual connection through CP’s Belleville Subdivision to Bowmanville. When service opens, the line will provide four morning trips along the line to Union Station in downtown Toronto, and four afternoon trips making all station stops to the new Bowmanville station. 

Project Owner: Metrolinx

Project/Construction Manager: Advance Infrastructure Planning Contract: Bowmanville Construction Partners (BCP)—Ledcor CMI Ltd. and Dragados Canada Inc.

Other Key Players: Wood E&I (WSP) (consulting engineer/geotechnical studies/environmental assessment), Stantec (technical advisory Services); Deloitte, Golder (geotechnical studies/environmental assessment), AECOM; Hatch (consulting engineer); Turner & Townsend (project controls)