The Scarborough Subway Extension is a 7.8-km extension of TTC’s Line 2 Bloor-Danforth Subway, from the existing Kennedy Station northeast to McCowan Road/Sheppard Avenue. The line will include three new stations at Lawrence Avenue and McCowan Road, Scarborough Centre and a terminal station at McCowan Road and Sheppard Avenue. Construction for the Scarborough Subway Extension began in the spring of 2021 at the corner of Sheppard Avenue and McCowan Road with the excavation of the tunnel launch shaft, which is about 80 metres long, 28 metres wide, and 28 metres deep. Tunnelling started in January 2023.